Sunday, November 2, 2014

Make it sunburn again~

17 October 2014

Ok. This is not a joke or something that you can imagine. It was a shocking moment when the area of our beds was not (12 x 4) feet... What?! Actually, it gonna be (12 x 4) feet of the surface on our beds. That moment shut my mouth and its felt like a lot of arrow attack me non-stop. So, I accepted it and took this challenge to improve our bed and repair it. I worked on my own beds for about 1 hours including talking to my friends and create my own strategist. Most of us finish it before 11 a.m. Fuuhhh~ finally finish it even there still have a lot of things to do but we have to focus on our beds.
Girls' power... you go girl, keep it up!

We had a conversation before we start to improve our beds.

Remove the stone.

Take a rest and feel the environment.

This is our beds.

Pull it, push it!



Sunday, October 12, 2014

Continue to work hard

3 October 2014

We got another mission, we need to open a new area for our crops because it's not enough for 61 or 62 students. So, we have to make another crops area. Then, we need to make a plan dividing into 3 groups again.


  • First group
    • Marking for the another crops area
  • Second group
    • Digging for the crops
  • Third group
    • Clearence the remaining area for the new crops area.
We have to make it systematically so that our mission will be more easier and can finish it as soon as possible. This time all of us have to use a lot of energy to dig for our crops. We did not just for us but for the others also. About 60% more to complete our mission. Yeah!

This is how our crops look like

As you can see, we do it together

Looks like a graveyard but this crops will be use for planting

Its remind me the first time how it look like.

Next step and start move on

26 September 2014

Ok. This is our next step. We got a new mission to finish it until 17th September 2014. We have to prepare our own crop but we have to mark first the area of the crop before we start digging it. Marking for me is we must think of strategist and do it creativity so that it will be finish in a short time.  The crop that we need to make is 1 meter width and 4 meters long, so we needed to mark about 60×85 square feet for 60 beds. The area must has a drain for water flow and agro road to be used as a road from one bed to another crop. The crops must be 2 feet from the drain and 1 feet from each other. The agro road must be in 3 feet width. Its gonna be a tough job because it's need a lot of energy. We have to make a plan so we divided into 3 groups.

  • First group.
    • Marking the area of the crops
  • Second group.
    • Digging for the drain
  • Third group.
    • Clean the remaining area 
Come on. Keep it up guys!

Digging the drain.

Marking the area for the crops
Measure the area of our farm

Thursday, October 9, 2014

Sorry Guys...

21 September 2014

I am so sorry because I can't joined with all of you because I got a bad news. I lost my friend last night. She passed away because of accidents between car and motorcycle. Thanks God, they understand the situation that I have to face. She is my best friend. I can't stop crying and send massages to my friends that got the opportunity back home and visit her. I always keep in touch with her best friends and update about her funeral. I am really sad and my roommates also understand my feeling. I hope she rest in peace over there. Al-Fatihah Nurain Najihah

Keep working n working n working n working n . . .

20 September 2014

We continued our job to clear our SHARE FARM. We started at 8.00 am. Seriously, my energy was not fully enough recharge. So, I take this opportunities to work and tried to communicate with the others. Then, I meet Miss Michelle. We tried to communicate and having fun work together. I love it when we do something and at the same time we get a new friend. After we cut off the trees, we pulled the roots, throw away the stones and clear it. It was a tough work that I ever did. Our skin slowly become darker and loss a lot of energy. Pulling out the roots was not an easier thing, we have to use a lot of energy to pull it out. Sometimes, someone got injured. This is we call as planters' lifestyle. We must be strong and keep working.

Keep it up guys!

Clean and Clear

19 September 2014

Seriously, I had to wake up around 5.00 am because we will gathered or we call as ROLL CALL at 6.30 am. I can't imagine the moment when I woke up at 5.30 am. This was our very first time and my new experience gathered at the early morning. We sang Planters' song and Negaraku (our national song). After that, we visited equipment store and our farm. This is my first time holding parang cut off all the trees. Wow, I felt like killed someone. We started our clearence project around 8.45 am and we finish it about 30% at 11.00 am. We were giving a responsibility to finish our clearence project for 3.8 ekar just in one week. Ok, it's gonna be a tough job for us. I was really tired. We use around 2 hours to cut off the trees. 
Looks like one of the scene in Lost. We have to survive guys!


Can you imagine the how big the area of our farm? 

We call it as SHARE FARM

We still have a lot of work to clear it.


I have to stop here. I need to rest and recharge my energy. Bye!

First Day!

12 September 2014

Hello, Malaysia! Ok! Make it simple and start writing. For our very first day and first class of FPA400, we have been introduce to our new lecturer, Mr Sahrizan. Applause! Applause! Then, I will introduce you our faculty student council. Oh my, they so hot. Let's go!

This is our Leader known as Kangani or KJ or Ketua. Kangani is the nickname for the landlord. Awesome. His real name is Muhammad Nur Hidayat.




This is his partner or assistant known as PKG. Her name is Nur Aishah. 



Oh my God, this is me as secretary. Forgot to introduce myself, my name is Muhammad Jafni Adli. 




This is my assistant. Her name is Nur Shazlin Amirah. Say cheese..




Let me introduce you our treasuries or we call as Ah Long. Her real name is Nurul Atikah for class A and Nur Shahiera for class B.


This is Atikah
This is Shahiera
                          


So, I will introduce you our committee members.

First, this is the most important guys for our project, Tools and Equipment Committee Members.


From left is Muhammad Azim Hakimi and Miss Belinda Michelle
Then, this two guys will supply us with bread for us in early morning, Committee Members of Foods.


This is Nurnadia Natasya. Just a little sweet girl.
                                 
 
This is Azammudin. The first guy I meet before.





The Discipline Committee Members. 


This is Muhammad Rosasyraf. One of the handsome guys in our
faculty.
This is Nur Amaliya. She has a beautiful smile but
has heart of lion.

Hello! Hello! Communication Committee Members.

His name is Muhammad Fazlee. Handsome right? 
This Miss Nur Aqilah. Nice scarf.

Here we come with Safety and Emergency Committee Members


This is Nik Mohamad Hanif. You can call him Nik.
This is Aida. Just Aida only.
 Keep it clean and clear. Hygiene Committee Members.


This is Mr Nazir or you can call him Zack.
This is Nur Amira or you can call her MiraMiraMira


So, that's happen in the first day of FPA400 class. Bye!